One of the most important stages of any aluminium window, door or facade project is the survey and measurement carried out before production starts. A mistake made at this stage costs time and extra labour when it is noticed later. A survey done correctly, on the other hand, makes the quote realistic and lets the installation go ahead without problems. This article explains how the survey and measurement process works, what to look out for, and the part that orientation and climate play in this process in North Cyprus.
Why are the survey and measurement so important?
However correct an aluminium system looks on the drawing, it will not sit properly if it does not match the real dimensions and conditions of the opening where it is to be installed. If small deviations such as a wall that is not square, differences in floor level and marks left by the old joinery are missed, the manufactured system can cause problems at installation. For this reason, the survey and measurement carried out on site are the precondition for a correct quote and a trouble-free installation.
What is checked during the survey?
The real dimensions of the opening
Width and height are measured at more than one point of the opening; even if the walls and existing frames look straight, they may be slightly out of true or out of square. The narrowest measurement is taken as the basis for the manufacturing dimension. The diagonals are also measured; the difference between the two diagonals shows whether the opening is square, and if necessary the system is adapted accordingly.
Floor level and threshold condition
For doors opening onto a terrace, balcony or garden, if a threshold-free or low-threshold transition is wanted, the difference in floor level should be clarified beforehand. Whether water drains in the right direction is also checked at this stage.
Condition of the existing structure
In renovation projects, how the existing joinery will be removed, the condition of the wall under the frame and any signs of damp or cracks are examined. These findings determine both the installation plan and, if needed, the need for extra labour.
Orientation and climate effect
The direction the opening faces, especially on south and west facades that receive the most sun, is assessed in terms of glass type and the need for shading. Whether the opening is exposed to wind also affects the choice of profile and hardware. For buildings by the sea, salty air is taken into account in choosing the surface treatment.
Access and installation logistics
Especially for installations on upper floors or at points that are hard to reach, how the material will be carried and what equipment will be needed is planned during the survey. In this way time is not lost on installation day and safety measures are taken in advance.

After measuring: project design and moving to production
The information collected at the survey is turned into a technical drawing at the project design stage. At this stage, choices such as the profile system, glass type, opening direction and colour are finalised. After the drawing is approved, the manufacturing process begins; manufacturing based on correct dimensions lets the system sit without problems at the installation stage.
Points to consider in renovation projects
If joinery is to be replaced in an existing building, more issues are assessed at the survey than in a new building. The frame type of the old joinery and how it is fixed to the wall determine how difficult removal will be; in some cases the parts of the frame built into the wall must also be taken into account. If there is damp, cracking or old filler around the existing joinery, extra preparation may be needed for the new system to sit properly. How the plaster, paint or stone cladding on the inside and outside will meet the new joinery should also be discussed at the survey; this junction affects both the appearance and the waterproofing.
Coordination in projects with more than one opening
If many openings of different sizes and types are dealt with together in a villa or facade project, the survey is planned accordingly. The size, orientation and intended use of each opening are recorded separately; at the same time, care is taken that all the joinery is consistent in colour, profile appearance and hardware. For example, if the same facade has fixed glass, a sliding door and small ventilation windows, these openings should be assessed together at the survey. In projects with many parts, carrying out the survey and project design together makes it easier for the parts to fit each other at installation.
Questions you can ask during the survey
Questions asked during the survey prevent unexpected situations at later stages. Some of the matters that are useful to clarify at the survey are as follows:
- Are the size and floor level of the opening suitable for the type of system I am planning?
- Will any extra work on the wall be needed when the existing joinery is removed?
- Is the colour and profile appearance I have chosen technically feasible for the size and position of the opening?
- Is the glass type I prefer (such as solar control glass or safety glass) suitable for this opening?
- Is there anything in other areas of the house (floor, walls, surrounding plants or paving) that needs to be protected during installation?
Noting these questions in advance makes the survey efficient and lets the technical drawing begin with more reliable information. At the end of the survey, it is useful to ask the team for a summary of the measurements and conditions found, and of any special points such as a difference in floor level or extra labour. In this way both sides agree on the same information before moving to project design.
Your preparation as the homeowner
A few preparations before the survey appointment speed up the process:
- Provide easy access to the area where the openings to be replaced or newly made are located.
- If available, have the architectural project of the building or information on the existing joinery ready.
- If you have a general preference on colour and profile appearance (plain, wood-effect, anodised look), share it with the survey team.
- If it is a renovation, also mention your plans for painting, plastering or floor work around the opening, so that the order of the work can be planned correctly.
- Note down your questions and priorities (for example sound insulation, security, ease of use).
Common mistakes at the survey
- Measuring at a single point: Taking a measurement at only one point of the opening can miss small deviations in the wall.
- Ignoring a difference in floor level: Especially for doors opening to the outside, this difference can later lead to a problem with the threshold or water drainage.
- Not considering climate and orientation: The glass and shading needs of a wide opening facing south or west are different from those of an opening facing north.
- Leaving access and logistics to the end: If no plan is made for carrying material on upper floors or through narrow passages, delays can occur on installation day.
- Treating more than one opening separately: So that the windows and doors on the same facade are consistent in colour, profile appearance and hardware, the openings should be assessed together.
Frequently asked questions
What does the survey and measurement service cover?
The survey covers on-site examination of the real dimensions of the opening, the floor level, the condition of the existing structure, and the effects of orientation and climate. The quote and technical drawing are prepared on the basis of this information.
Should I be present during the measurement?
It is recommended that you are present, so that preferences such as colour, opening direction and your priorities are passed directly to the survey team. If you cannot be present, you can send your notes in advance.
Is the removal of the existing joinery planned at the survey stage?
Yes. In renovation projects, how the existing joinery will be removed and the condition of the wall under it are assessed during the survey; the installation plan and any extra labour are determined accordingly.
What happens if a measurement error is noticed later?
A measurement error can mean that the manufactured system does not fit the opening exactly and requires extra correction work. That is why taking measurements at more than one point and examining the existing structure carefully at the survey are important.
What information should I have ready for the survey?
It is useful to share with the survey team the architectural project, if there is one, notes on the existing joinery and your colour and appearance preferences. This information speeds up the technical drawing and quoting process.
If you would like to arrange an on-site survey and measurement appointment for your project, you can get in touch with us.