The performance of aluminium joinery depends on correct installation as much as on the material. A system that is not installed with care can leak water and air or work loose over time, whatever the profile quality. In this article we explain the stages of installation, the points to watch and the common mistakes. In Famagusta and on the Cyprus coastline, doing every stage with care matters even more because of salty air, sun and strong winds.
Preparation before installation
The most important step before installation is the survey and measurement. The wall, frame and floor dimensions, the condition of the existing joinery if any, and, for systems that need an electrical or motor connection (for example a motorised pergola or shutter), the infrastructure need are determined at this stage. The measurements taken on site during the survey and measurement service are passed on to the design stage and production is planned accordingly. If this step is skipped or done carelessly, on installation day the frame may not fit the wall opening, the sash may hit the furniture when opening, or the glass size may turn out wrong.
Installation stages
1. Site preparation and removal
In renovation work, the existing joinery, the shutter box if any, and the surrounding plaster or silicone are removed first. The wall opening is cleaned; structural problems such as damp or cracks come to light at this stage and are assessed. In new buildings, the opening dimension and the vertical and horizontal deviations of the opening are checked.
2. Frame installation
The frame is aligned in the wall opening using a level and a plumb line. If the frame is not level and plumb, the sashes do not work in balance, and the fit of the locks and hinges deteriorates over time. The frame is fixed with plugs, screws or anchors suited to the structure of the wall. The number and spacing of the fixing points are determined by the size of the system and the wind load.

3. Insulation and joint details
The gap between the frame and the wall is filled so that it is airtight and watertight; suitable filler and silicone are applied to the inner and outer joints. This stage is especially important in buildings by the sea: humid, salty air entering through poorly sealed joints can cause stains and corrosion over time. The water drainage holes are left open so that rainwater is discharged out of the frame.
4. Sash and glass fitting
After the frame is fixed, the sashes are fitted and the hinge and lock hardware is installed. The glass is seated in the sash with gaskets and support pieces called setting blocks. If blocking is done wrongly, the glass can slip under its own weight, the sash may not close properly, or the gasket may not press evenly at every point.
5. Adjustment and mechanism check
At this stage, fine adjustment is made so that the sashes open and close easily, the locks seat fully, and, in sliding systems, the rollers run properly on the track. Having the gaskets press evenly at every point is important for both insulation and gasket life. In motorised pergolas and shutters, the motor and sensor connections are tested.
6. Cleaning and handover check
After installation is complete, silicone residue, protective films and construction dust are cleaned. The opening of the sashes, their locking, any motorised movements and the drainage holes are checked one last time. This check allows small adjustment problems that might appear in use to be noticed early.
Points to watch during installation
- Level and plumb check: Even small alignment errors in the frame can upset the balance of the sash.
- Filling the wall opening: The gap between the frame and the wall must be filled completely with insulating material.
- Drainage holes: Water drainage channels must be kept open and must not be closed off by painting or silicone.
- Fixing points: On terrace, garden and facade installations exposed to wind, a sufficient number of suitable fixings must be used.
- Glass blocking: The setting blocks must be placed at the right points so that the glass weight is distributed evenly on the sash.
- Work safety: Suitable equipment must be used and safety measures taken when working on upper floors and carrying large panes of glass.
Common mistakes
One common mistake is fixing the frame in a hurry without checking that it is level; in this case the sashes may become hard to close over time or move on their own. Filling the wall opening incompletely can cause heat loss and a whistling sound in windy weather. If the drainage holes are closed with silicone, rainwater collects in the frame and moisture forms on the inner surfaces over time. If blocking is not done, or is done wrongly, the glass can slip under its own weight and the fit of the lock and hinge can be upset.
Why should installation be done with more care in the Cyprus climate?
In Famagusta and other areas on the coastline, climate conditions call for extra care in installation. In the long, hot summer months, materials expand with heat; an allowance for this expansion must be left at joints and fixing points. Salty sea air can cause corrosion over time on exposed metal surfaces and in poorly sealed joints; for this reason, coating and insulation details must be applied carefully. Rain and condensation in the winter months require drainage and joint sealing to be done correctly. Because of strong winds, the fixing details are planned according to the size of the system in systems with large glass surfaces and in outdoor installations such as pergolas, shutters and facades.
Installation differences by system type
Alignment, fixing, insulation and adjustment are basic steps in all systems; the details of installation vary with the system. In windows and doors, frame alignment, glass blocking and gasket pressure come to the fore. In sliding and lift-and-slide systems, the track being straight and level and the roller adjustment are added to these. In pergolas, fixing the columns, the motor and sensor connections if any, and laying the water drainage channels at the correct slope are important. In shutters, box installation, track alignment and, in motorised models, cable routing need attention. In balustrade and glass wall installations, having load-bearing anchors that suit the structure and are sufficient in number is decisive for safety. Carrying out the installation in line with the details set at the design stage reduces the chance of mismatches on site.
Habits for use and checking after installation
In the first period of use, it is helpful for you to do some checks yourself. You can open and close the sashes a few times to check that they work in balance and that the locks seat fully. Checking after rain that the drainage holes are open prevents water collecting in the frame. In sliding systems, dust and construction residue left in the tracks can make the sash harder to move; for this reason the tracks should be cleaned before first use. In motorised systems, check that the remote control and sensors work correctly. If you notice imbalance, difficult opening and closing or noise in a sash, reporting it early prevents a problem that could be fixed with a small adjustment from growing.
The importance of communication during installation
For good installation, in addition to site workmanship, all stages from survey to handover need to run in harmony with each other. Systems prepared to measure at the manufacturing stage are fitted in place by the installation team. Reporting adjustment needs that appear after installation in good time helps the system work without problems for a long time.
Frequently asked questions
In how many stages is the installation of an aluminium system completed?
Installation generally consists of the stages of preparation, fixing the frame, insulation, sash and glass fitting, adjustment and handover check. The details of the stages vary with the type of system (window, door, pergola or shutter).
At which points are mistakes most often made during installation?
Common mistakes are fixing the frame without checking that it is level, filling the wall opening incompletely, closing the drainage holes and skipping glass blocking. Over time, these mistakes can lead to air and water leaks and mechanism faults.
What should be considered when installing a new system in place of old joinery?
The removal must be done without damaging the wall, the resulting opening must be cleaned, and structural problems such as damp or cracks if any must be assessed. The new frame is aligned and fixed in this cleaned and checked opening.
Is a climate-specific precaution needed during installation in Cyprus?
Yes. Because of salty sea air, sun and strong winds, particular attention is paid to joint sealing, fixing details and protecting the surface coating.
Why is the check after installation important?
The check made before handover confirms that the sashes open and close in balance, that the locks and mechanisms work properly and that the drainage holes are open. This check allows small problems that might be met in use to be noticed early.
To get information about the whole process from survey and measurement to installation, you can contact us.